• HOME
  • DE
logo
Skip navigation
  • GU COMPETENCIES
    • ENGINEERING
    • PROJECT MANAGEMENT
    • HIGH-QUALITY COMPONENTS
    • QUALITY CONTROL
    • OTHER SERVICES
  • HIGH QUALITY ENGINEERING
    • TURNING
    • MILLING AND DRILLING
    • EROSION
    • WELDING
    • MEASURING AND TESTING
    • CAD/CAM
  • THE COMPANY
    • ABOUT US
    • OUR STORY
    • AGB
    • PURCHASING CONDITIONS
    • DISCLAIMER
  • HUMAN RESOURCES
    • APPRENTICES
    • SPONSORING
  • DOWNLOADS
  • ARCHIVE
    • SNOW SCULPTURE
  • CONTACT US
    • OUR TEAM
    • OUR LOCATION
    • E-MAIL
 

MAX LEHNER & CO. AG | SWITZERLAND 

The Company, General Terms and Conditions

General Delivery and Guarantee Conditions, MAX LEHNER & CO. AG

1. Our prices are net off ramp, unless otherwise agreed. They are non-binding. All expenses for packing, shipping, customs, taxes, installation, instructions, and other expenses shall be borne by the purchaser. The delivery contract follows the acceptance of the order. The VAT is not included in the price and, if necessary, will be charged separately. 

2. Payments shall be made according to the agreed terms, always in Swiss francs in Graenichen. Payment may not be withheld or reduced due to defects in the goods delivered or counterclaims of the customer. In case of late payments we calculate default interest from the due date.
 

3. Transportation: All shipments are at the expense and risk of the purchaser, which means that they take, from the moment the goods depart our factory or warehouse, the full risk of damage, loss, delay, etc. The transport insurance is the responsibility of the buyer. 

4. Delivery time: Our information about delivery times applies for readiness for dispatch of the goods from the factory Graenichen. For partial payments, the delivery period begins with the payment of the first sum. The agreed delivery period shall be extended accordingly:

  • In cases of force majeure and unforeseen events such as: late or defective material and piece deliveries from our suppliers; strikes, lock, epidemics, military or warlike events, etc.: also in case of unexpected material or energy shortages, faulty castings or other delays not caused by us in the completion of major parts and generally in case of malfunction, transportation obstacles, governmental prohibitions or impediments.
  • Failure to comply with the agreed terms of payment.
  • If all the information necessary to execute the order does not arrive on time into our possession, or if subsequent changes are desired.
     

5. The warranty period is according to the agreed terms, calculated from commissioning, for defective parts of the product delivered by us in material and workmanship. For other products provided, we assume no responsibility, but this remains solely with the customer. Any other compensation claims can not be accepted. Transport costs and fitter charges shall in any case be borne by our customers. For further defects, in particular for the consequences natural deterioration, excessive loading, incorrect treatment or improper installation and maintenance of delivered spare parts, as well as costs of business interruption or passenger and property damage, we are not responsible.

6. Complaints regarding deliveries need to be made at the latest within 8 days of receipt of the goods in writing.

7. Retention of title: until receipt of payment, the goods delivered shall remain our property.

8. Place of performance and jurisdiction is Graenichen, respectively Aarau.

ISO-Certification

tl_files/resources/en/frontboxen/ISO_Cert_Frontbox_EN.jpg

 

On March 22, 2019, Max Lehner & Co. AG was audited in detail as part of DIN EN ISO 9001 certification. The audit has been successful and we are proud to serve you with our high quality services out of our ISO certified facility.